ACSI
Alta Consulting Services, Inc.
  • Welcome
  • About
    • Ethical Tenets of Our Practice
  • Services
    • Commissioning >
      • Projects Commissioned
    • Design
    • Studies
    • Building Systems Integration, Installation & Cx
  • Project Experience
    • Airports & Marine Ports
    • Convention Centers/Auditoriums/Theaters
    • Courthouses
    • County Jails
    • Federal/State Prisons
    • Juvenile Facilities
    • Libraries
    • Manufacturing Facilities
    • Communications, Control & Command Centers
    • Healthcare
    • Park & Recreational Facilities
    • Public Safety
    • Training & Conference Centers
    • Transportation
    • Universities
    • Water Facilities
  • Careers
  • Contact

Santa Clara County Main Jail
San Jose, CA

Picture


PROJECT DESCRIPTION:
The County of Santa Clara Department of Correction required a study of their Main Jail Intake/Booking area 57 camera CCTV surveillance system. Part of the study focused on long-term storage of recorded video of the booking process; the technical options and their concomitant cost. The second part of the study explored interconnections of exiting systems to new color digital camera additions, and included discussion of options and limitation for interconnection with existing systems. The systems operate 24/7 in color digital with audio recording capability. 



Picture
ACSI's RESPONSIBILITIES:
ACSI established the CCTV surveillance system project requirements, performed a detailed examination and analysis of the booking and related areas, identified and assessed alternative technical solutions, and prepared model system solutions including estimated costs. In addition, ACSI worked with the County to select and refine the final model solution, then developed and documented a high level system design based on the final model solution to including the associated facility modifications (architectural, electrical, and mechanical) and prepared a final construction cost estimate to design, acquire, implement and operate the systems.  

 The deliverables included:
  • Project plan and schedule
  • Basement level floor plan CAD drawing
  • Assessment and estimate of digital video and audio storage requirements
  • Narratives and illustrations for initial model designs
  • Initial model design cost range estimates
  • High level system design document packages (final draft and final forms)
  • High level system design cost estimates (final draft and final forms)
  • Meeting notes from all meetings